These last few weeks have been primarily dedicated to siding. The homeowner decided to seal the concrete floor and to avoid disturbing its set up, we focused on the siding.
The siding that is going up is Beetle Kill Pine, that has been charred to give it that weathered effect. All the charring was done by the homeowner, as it was his personal project.
We’ve been at it, despite the winter storm front that moved in last week, making for lots of snow and freezing cold temps.
A look at the nice south side, with all those windows, allowing for maximum solar gain.
Up, Up Up it goes!
Rain or shine, blizzard or not we are on site doing work!