Stairs!

The stair way from the second to third floor went in a few weeks back. This section of stairway is a floating stairway. The treads will be an oak wrap. The stringer will remain visible and there will also be a custom steel handrail. All the metal work on this project is being done by Curly Metal Fabrication!

Two Flights of StairsAbove: Stair way from entry way to the “basement” level. 

StairWay

Above: Floating Stairway from Second Level to Third level

Stairway 2

We can’t say enough about working with great people, and Ben Curly and his team are great to work with! Below is Andrew welding things together, which I personally was thrilled about because it meant no more hauling materials up and down a ladder!! Woohoo!!

Andrew Welding 1Andrew Welding 2

Stairway View

Our Fort Collins project features several large windows and sliding doors, mainly at the patio locations on both the second and third floor. The particular window seen in this series is at the intersection of the second and third floor stairway and was quite fun to install. It certainly creates a dramatic look from both outside and inside. The homeowner is considering the trendy glass globe cluster chandelier as the feature lighting for this space; which will really add an elegance to the steel and wood stairway which it overhangs!

Window FrameIMG_20181106_160139678IMG_20181106_172611704Jason in Window FoCo

One Truss, Two Truss, Green Panel, Heavy Panel.

Last week we mixed in a few crazy windy days with putting up trusses. Check out the quick video below.

IMG_20180409_090024238

IMG_20180411_115007874

As soon as the trusses were in place, we began to install the floor sheathing. This project is using the Warm Board system.

Aside from the very cool minty green color- because all floor sheathing should have cool colors, obviously- there are some other useful features.

These boards are 1.125″ thick, which makes for a very heavy to lift panel but stiff floor. That super cool mint color is a 22 gauge aluminum, which allows for heat conduction.  Tile, hardwood, carpet-any floor covering, is compatible with it.

download_20180417_100858

IMG_20180411_091035174

IMG_20180411_090412834

Another well thought out feature is the underside markings which help during MEP installation. The markings ensure the subs installing mechanical, electric and plumbing systems know exactly  where not to drill.

IMG_20180411_114341138

Check back for more updates on the Warm Board experience!

Making it Work

Sometimes on our job sites, we find ourselves coming up with clever solutions to tricky problems. For example, there are several large structural posts and heavy beams being placed throughout our Fort Collins project home, and we found ourselves getting crafty for an afternoon to get them in place. Getting the top beams into place for welding required the use of our truck and a custom made bobcat attachment (see bright yellow unicorn horn on the bobcat below). The attachment was made by one of our own, and has been used for several other jobs-it’s magical, just like a unicorn horn. As Theodore Roosevelt once said, “Do what you can, with what you have, where you are.”

 

IMG_20180308_163005566_HDRIMG_20180308_170849246_HDRIMG_20180308_170909188_HDRIMG_20180309_112707653_BURST000_COVER_TOP

And since it’s Aloha Friday, lets have one last look at the mythical Bobcaticorn…

IMG_20180404_162558_368

It’s so magical.  

Fort Collins Project: Concrete Floor

Once the walls were poured, we got right to work getting the floor ready to be poured.

Steps that had to be taken before concrete could be laid were: trench for in-slab plumbing, trench for drainage and radon mitigation, backfill, compact, install steel posts and beams, move in and level gravel, lay out foam, lay out plastic, install rebar mesh, install heat loops, and add chairs for mesh.

IMG_20180223_103658282_HDR

IMG_20180224_134432384_HDRIMG_20180302_155553669_HDRIMG_20180306_114951843IMG_20180308_170849246_HDRIMG_20180314_103750790_HDRIMG_20180314_170429754_HDRIMG_20180319_112056915IMG_20180320_141400672_HDRIMG_20180322_164607719IMG_20180326_192047856IMG_20180327_070443776_HDRIMG_20180327_123338207IMG_20180327_123343384IMG_20180327_123457470

Have any thoughts or questions? Let us know in the comments!

Stability

On our Fort Collins project, the homes entryway landing is built up from the ground level. To add stability to the backfilled dirt, we have spent a great deal of time getting chummy with the compactor and we have also added concrete to the loose dirt. Check it out below!

IMG_20180123_123319035_HDR

Here is the space before being backfilled. The entire front section of the home is being built up.

IMG_20180312_174213556_HDRIMG_20180312_174235976IMG_20180312_110433742

IMG_20180314_153448750_HDR

Once backfilled and compacted, Eric began forming up the stairs and landing.


IMG_20180327_123435113IMG_20180327_112608913_HDRIMG_20180327_123457470

There’s more concrete to be poured at the front, but at the moment we have the stairs competed and a small portion of the upper landing.

 

Berthoud Residence

We finished up at our Berthoud Project and although things have been quiet on the blog, we have been very busy! Here are some photos of the residence just before move in day. There were a few minor delays our clients had with some of the finishes they were doing independently of us, but we are really excited to share these photos and then get back there and take some “moved in” photos! Enjoy!

First Lets start with some of the Master Bathroom Features!

IMG_20171222_115945230

Walk in Shower. A great feature is the niche, which you can’t see in this photo, providing product storage out of sight keeping the attention on the details of the shower itself: a higher shower head and the mosaic glass liner that goes across the entire bathroom. Another interesting feature is the linear shower drain, located below the shower fixture.

IMG_20171222_120125223

The built-in niche, shown above, located along the wall with the door, providing a somewhat concealed space for shower products. 

IMG_20171222_120029521

The homeowners tired out several tubs to find the right one, and settled on this beautiful teacup tub with a freestanding floor faucet. The window provides ample natural light, while also giving privacy to the shower and tub when in use. We built the window space to be lower to provide a place to set a candle and glass of wine while relaxing, haha! 

IMG_20171222_115958505

The Master Bath Vanity, before the cabinets were finished (one of the delays our homeowners encountered) features a tall middle section where the outlets are housed, out of sight and convenient for storing the beauty products that require an outlet! On the back wall, you can just barely make out the the thermometer. The Bathroom floors heated, so no cold feet!! 

IMG_20171220_121843690

The bathrooms upstairs also feature the wonderful heated floors!! Doesn’t it sound just wonderful to not have to walk into a bathroom barefoot and feel like you just stepped across the frozen tundra!?!

IMG_20171220_122309904

A view across the upstairs hall, with a little look at the custom handrail! There is a lot of natural light in the upstairs area. 

IMG_20171220_122938390

The homeowners wanted to incorporate a little bit of the existing structures of their property (a horse barn) into their new home. It’s such a mindful idea and is featured in their powder room. The sink wall has the barn wood laid out horizontally. The family, together, selected the pieces of wood they would use and laid them out. The husband installed the wood with his son and his wife found a barn wood frame for their mirror. We love when the homeowners find a unique thing to add to their home! 

IMG_20171220_132521570_2

The Laundry room features this beautiful full piece counter and an apron sink. Harrington Constructions own Eric worked so hard fabricating the beautiful counters throughout the home!! 

IMG_20171220_132539300

One thing we did across the window wall, where the washer and dryer are also at, was add wainscoting to the wall. It wasn’t originally called out in the plan, but it really added to the space.

IMG_20171227_133156529 (1)

Looking out from the hall closet into the very tall open living room. The high ceiling in the entry/living room gives a lot of light and character to the space.

IMG_20171222_115736965

Looking into the office, the homeowners really loved incorporating sliding barn doors into a few of the spaces, this being one. 

Finally, let’s look at the kitchen. This was definitely an important space for the homeowners and it turned into an incredibly beautiful and functional gathering space. Keep in mind, not all the details are finished in these photos- a teaser to come back and see the space with the doors and panels installed!

IMG_20171222_115543398

Some of the great features in this space are the island sink, the stove top with the  curved glass rangehood and heated tile floor. The stacked oven and convection oven against the wall, the main sink with the triple window set up. Tall cabinets were a must for our homeowners, as was the large island. 

IMG_20171222_114916966

IMG_20171222_134431905

Here’s a little close up look at the beautiful countertop.

IMG_20171222_182547999

The night light function on the rangehood is a great feature!

IMG_20171222_115305354

IMG_20171222_115316723

The pantry also features sliding barn doors, and base cabinets with a coffee bar!

Have any questions about what you have seen in any of the photos? Let us know in the comments! Thanks for taking the time to check out the features and we are looking forward to showing the moved in photos in the coming weeks!

~Dusty

Unveiling

One of the most prominent features of our current project in Fort Collins, is the first level concrete walls. These walls are 11ft tall and except for the front entrance planter (seen in this video) are smooth faced; the planter is board formed. The walls were formed with snap ties and have a very modern look. As we continue to strip away the forms on the walls we will share more videos and photos of this feature!

We also plan to host periodic open houses throughout this project, giving anyone interested an opportunity to come meet us, check out our project and ask questions. We will post the days of these events here and on our Instagram account.

Looking Around: Berthoud Project

Things are rolling on our Berthoud Project. The cellulose has been blown in and drywall is just about finished. Here is a little peek around the house.

IMG_20170814_143950_941

Standing in the Dinning Room, kitchen to the right.

IMG_20170814_144039_684

Looking out from the Master bedroom toward the Office (where tiny boss is), Living and Dinning rooms. Also looking up to the second level.  

IMG_20170814_144131_256

In the Master bedroom, to the left is the closet and to the right is the bathroom.

IMG_20170814_144237_073

Moving upstairs, we can see a bedroom, bathroom and the beginning of the loft space.

IMG_20170814_144306_714

Here we see the rest of the loft space, a second bedroom is behind the loft wall and then to the right is the mechanical room.

20170814_144324

Looking down out from the loft area toward the entry way where the office is visible.

20170814_144541

Moving back downstairs, this is the kitchen area. To the right is the pantry. Down the hallway is a laundry room, powder and entry into the garage.

20170814_144609

Last we have a panorama from the dinning room looking into the kitchen (to the left) and the living room and entry way. to the far left in the photo you can see the master bedroom door, and in the right corner is the office space.