“Baby It’s Cold Outside” has been the jingle on our minds at our Fort Collins project these last few weeks. Between adjusting to winter temperatures and crazy winds that blow down from the mountains, our work space has been just a little chilly and most days we look like we may have added 10lbs to our person just in winter layers!

Last week we installed the large glass window/doors that over look the patio deck. This large glass fixture is on the South Side of the house, so during those chilly winter days the homeowners will benefit from the heat gains at this location!

Check out our super fun process photos and a few other window shots!

IMG_20181205_091217579_BURST000_COVER_TOPIMG_20181205_091247876IMG_20181205_131322437IMG_20181205_141359097IMG_20181205_141445487

~

~

IMG_20181120_090649262IMG_20181120_090612676

One Truss, Two Truss, Green Panel, Heavy Panel.

Last week we mixed in a few crazy windy days with putting up trusses. Check out the quick video below.

IMG_20180409_090024238

IMG_20180411_115007874

As soon as the trusses were in place, we began to install the floor sheathing. This project is using the Warm Board system.

Aside from the very cool minty green color- because all floor sheathing should have cool colors, obviously- there are some other useful features.

These boards are 1.125″ thick, which makes for a very heavy to lift panel but stiff floor. That super cool mint color is a 22 gauge aluminum, which allows for heat conduction.  Tile, hardwood, carpet-any floor covering, is compatible with it.

download_20180417_100858

IMG_20180411_091035174

IMG_20180411_090412834

Another well thought out feature is the underside markings which help during MEP installation. The markings ensure the subs installing mechanical, electric and plumbing systems know exactly  where not to drill.

IMG_20180411_114341138

Check back for more updates on the Warm Board experience!

Tight Squeezes

Lets hear it for Bryan, who occasionally gets the Bobcat into some precarious places, and then back out again. He’s like a lion tamer-only it is a Bobcat (not the animal obviously) and he’s just a quiet construction guy weilding a tool bag instead of a whip. 3 cheers for Bryan!

As we showed you last week, sometimes we do what we have to do to get the work done. It isn’t always easy, especially when you are running a large piece of equipment and you have to be mindful of all the places you can’t go.

IMG_20180224_133200754

Making it Work

Sometimes on our job sites, we find ourselves coming up with clever solutions to tricky problems. For example, there are several large structural posts and heavy beams being placed throughout our Fort Collins project home, and we found ourselves getting crafty for an afternoon to get them in place. Getting the top beams into place for welding required the use of our truck and a custom made bobcat attachment (see bright yellow unicorn horn on the bobcat below). The attachment was made by one of our own, and has been used for several other jobs-it’s magical, just like a unicorn horn. As Theodore Roosevelt once said, “Do what you can, with what you have, where you are.”

 

IMG_20180308_163005566_HDRIMG_20180308_170849246_HDRIMG_20180308_170909188_HDRIMG_20180309_112707653_BURST000_COVER_TOP

And since it’s Aloha Friday, lets have one last look at the mythical Bobcaticorn…

IMG_20180404_162558_368

It’s so magical.  

Trusses

This week we put down the bottom sill plate for our first floor and today we began marking out truss locations, and bringing  trusses into the house to set in place. It is exciting to be starting the framing, as lots of people stop by to ask us what we are doing.

IMG_20180405_144809_202

IMG_20180405_085823280IMG_20180405_095620752

IMG_20180405_085728047

download_20180405_144449

 

Fort Collins Project: Concrete Floor

Once the walls were poured, we got right to work getting the floor ready to be poured.

Steps that had to be taken before concrete could be laid were: trench for in-slab plumbing, trench for drainage and radon mitigation, backfill, compact, install steel posts and beams, move in and level gravel, lay out foam, lay out plastic, install rebar mesh, install heat loops, and add chairs for mesh.

IMG_20180223_103658282_HDR

IMG_20180224_134432384_HDRIMG_20180302_155553669_HDRIMG_20180306_114951843IMG_20180308_170849246_HDRIMG_20180314_103750790_HDRIMG_20180314_170429754_HDRIMG_20180319_112056915IMG_20180320_141400672_HDRIMG_20180322_164607719IMG_20180326_192047856IMG_20180327_070443776_HDRIMG_20180327_123338207IMG_20180327_123343384IMG_20180327_123457470