Loveland Project Framing Tour: Exterior

IMG_4580.JPG

Today we are trying out something new, a video tour of our current project. This video in particular is of the exterior framing. The goal is is give our readers an idea of how the home is shaping up and to also start getting videos out there. It’s all a work in progress! Next week we hope to have a second video of the interior spaces posted.

*This video takes a moment to start playing from the time you press play.

Sprouting Up

Aaahh, spring has arrived in Colorado…or at least it seems that way on a bi-weekly basis. One week sunny and hot, the next cold and wet.

As promised, in the previous post a look into how the framing has been going. We have brought on, J & D Builders from Greeley to help us out, and we are really enjoying working with them.

IMG_4559e

Profile view. The Kitchen area has trusses on. The garage is being sheathed for the second floor.

IMG_4488

Tilting up walls. These guys have had no problem working with our double wall framing system.

IMG_4542

Looking out the Dinning room window, that tiny person was placed there for scale. The homeowners wanted big windows to really capture the view they have of the buttes and Horsetooth Rock from the North side of their home.

IMG_4545

Jason and Bryan standing in the Kitchen.

IMG_4550

Looking out from the Kitchen into the rest of the first level. The “tiny person for scale” is standing in the Master Bedroom. The beam is situated over the Living Room.

IMG_4552

Here our scale model is standing under the beam and in front of her is the wash room and access to the garage. There are high ceilings throughout. The beams and columns for this project are Beetle Kill Pine, milled from The Forks Lumber Mill, whom we used for the Nederland Home.

IMG_4539

Here’s a look into the wall cavity. Soon we will be dense packing a whole semi load of cellulose into these cavities. One the ground is our vapor barrier. Just as on a roof, we must maintain a dry environment for the durability of our materials and the house as a whole.

IMG_4556

Scale Model standing in the Garage. Above the garage will be bedrooms.

IMG_4533

Here’s a look at some amazing custom made brackets we had done for the home from Charles Lefkowitz at, Sculpture and Functional Metal Work. We will have an upcoming post with more photos of the brackets we are using.

IMG_4501

IMG_4536

There last two photos are of the column brackets, one from the side, and one from the front. These brackets are giving structural stability and a very modern and industrial look to the home.

 

That Brindle Look

Have you missed us? We’ve been busy but have some exciting update posts on the way to show just how things are progressing!

IMG_4398e

We’ve poured the concrete floor, and remaining walls on our Loveland site. We had some really strong winds Tuesday while we poured the walls, making for a lot of fun with the pump truck and hose. The following day was much calmer and hotter, and we started bright and early. The pour went smoothly, thanks in part to great team work from everyone and having a good pump operator…and a tiny person to keep everyone  in check!

IMG_4448e

Hammer-Wielding Tiny Girl Boss

The slab is going to be stained, and to give it a nice look, we’ve burnished it. The slab is also fitted for radiant floor heating.

IMG_4386IMG_4393IMG_4398eIMG_4404IMG_4406IMG_4412

Quinn (above) stripping forms where the outdoor fireplace will be. The concrete was poured in several locations with the board formed look, giving it a rustic and also modern feel. 

IMG_4418IMG_4420IMG_4426IMG_4424IMG_4440IMG_4452IMG_4456

Later in the afternoon, we began stripping the foundation forms and Jason started making saw cuts the following day.

IMG_4475IMG_4480

In the next post, we will be showing off how the framing is going. We’ve had a few stall days due to rain (and snow) but it’s moving along and we can’t wait to post about it!

The Day no one said Cheese.

Yesterday we poured 1000 sq. ft. of garage floor concrete. That might explain why no one said cheese, or “oh it’s you…again…” or “hey, hold my drink and watch this”… Everything went pretty well, except for the weather, which couldn’t decide if it was going to be sunny or cloudy with rain…or sunny with gusts of wind..or… And then there is the tale of two cement truck drivers-one who was on par with hand gestures and one who wasn’t… In the end, it all worked out and we got the work done!!IMG_4308IMG_4318IMG_4320IMG_4323IMG_4326IMG_4332IMG_4340

Strip, Backfill and Pour (repeat)

We’re still working on the foundation at our Loveland project. We’ve completed the footings, poured the walls and next week we start pouring the floors, beginning with the garage. Things are progressing quickly.

Last week we removed the forms on the larger back walls.IMG_4262IMG_4267IMG_4275

Did we forget to share photos of the wall being formed?? Of course we did!! So hey, why not add them now, because this wall really does deserve some attention…and they were already edited for a post but just like the missing pairs of socks after a run in the dryer…well…

Looking good, right!! We agree, it is.

IMG_4269

Custom dog door. Lucky dog.

20160311_151612

Custom kid in dog door. Lucky kid.

IMG_4286eIMG_4263

Bryan, working his Bobcat magic and backfilling the foundation!

While Bryan backfilled, Eric, Jason and Quinn sat around in chairs…I mean placed chairs down under the mesh…for Monday…yes that is what I meant.

IMG_4299

IMG_4291IMG_4296

At the end of the day we had a strategic meeting for Monday’s main event: the garage pour.

IMG_20160312_081039

Cheers to the weekend!!

Dirty Thoughts

How often do you think about your septic system? I mean really think about it, dive into it, somewhere between the top layer of fats and oils and the bottom layer of solids and consider just how important it is to our health and environment.

First and foremost, your septic tank is more than just a waste holder, it’s a biological wonderland. Just the word “septic” refers to an anaerobic bacteria environment for decomposition. Bacteria from our bodies, our food, and products we use all end up in the tank playing a role in the decomposition of the wastes we “flush”. As we all remember from biology class, anaerobic bacteria work without oxygen.  In the septic tank then, anaerobic bacteria are working to get rid of nitrates that would otherwise cause algae blooms in the water shed. We have seen how disastrous an overabundance of nitrogen in water can be. One particular example is the dead zones in the Gulf of Mexico caused by fertilizer run off in the Mississippi river. Nitrogen found in the fertilizers (along with other chemicals) have caused algal blooms on the surface of the water, removing the oxygen in the water that is important for plant and animal life. We are talking specifically about nitrogen in water, and not nitrogen in the soil, and even more specifically about issues with industrial agriculture.

Looking inside the septic tank, one would see three developed layers: fats & oils, water, and solid waste. As your household waste enters the tank a series of bacterial processes occur to break down whats coming in. Fats, oils and solids are not broken down by the bacteria in the tank and are known as sludge. Sludge stays in the tank and has to be pumped out. What the bacteria does breakdown is added into the water that makes up the middle layer, and is then sent out of the tank into the drain field. The drain field is comprised of gravel, coarse sand or plastic chambers, and pipes. As the “clarified water” is leeched out, it runs across a filtration surface and is further separated and broken down by aerobic  bacteria found naturally in the soil. These bacteria work to finish breaking down waste and destroy pathogenic organisms that could cause serious health problems. This is why septic system design and implementation is so heavily regulated.We depend on our septic systems to function properly so that we have safe, clean water for human and animal consumption and agricultural purposes; and so that our land does not become a health hazard or worse: inhospitable. The picture in my mind is like something out of Mad Max, people with extra or missing limbs/organs or serious health problems and land that can’t support life.

 

Last Friday, the septic tank for our Loveland site was delivered. Check out some of the photos below:

20160218_09014220160218_09014820160218_10293120160218_15585820160218_110538

 

 

We’ve Gone Insta!

IMG_4240e

Here at Harrington Construction we believe that social media platforms are a great resource. As we continue to grow as a company we are trying to spread the word about what we do, why it’s great and why you or your parents, bothers, sisters, cousins, neighbors…any and everyone, should consider building a sustainable and efficient home! So check us out on Instagram, and follow along for spontaneous pictures of what we are up to!

https://www.instagram.com/harringtonconstruction/

Footed and Foxy

Footed and Foxy…oh lala. Moving into February has us running around like hens in a hen house being chased by the foxes (foxes being jobsites). We’ve poured the footings on our Loveland site, and have been installing the Fox Block and getting things ready for the second part of the concrete pour: the floor and walls. We have some pretty tall walls on the south side of the house, which will make pouring lots of fun, luckily everyone on the crew looovvveesss working with concrete. As our Loveland site continues progressing, we are also moving forward with a residence site in Berthoud, and working out structural details for a project in Fort Collins. There’s lots happening here and as the weather warms up and the sun stays out just a little bit longer each month, we are getting ready for Spring, thawed ground and lots of action!

20160125_100949

A few locals checking out the site…they disappeared once the work started happening, probably out of fear of being volunteered to help…

20160125_111903

All hands, in mud…errr on deck.

20160125_111140

Pump up the jam, pump it up…

20160125_110628

Tiny person, brought for motivational cheering…stopped being useful once a bag of Cheetos presented itself as viable snacking option.

20160130_09250520160130_09244520160130_08264420160130_083134

A quick look at the Fox Block, being installed, check back for more fancy stacking later!

Loveland Update

20151116_091241_004

Something we have really been appreciating is our interactions with our clients on this project. We are working with a husband-wife team, and the wife comes by the jobsite twice a day to walk and look over things, and talk about what is going on/where things are at. We’ve really enjoyed that as questions or concerns are thought up they are also addressed right away and the project continues to flow smoothly as we are all working together. Positive job site and client relationships are important to us and make our work easier and more enjoyable.

2015-12-07 11.26.08

Our house pad is almost complete, we’ve got a secondary pad site for a shop also being cleared out. Next up on our list is to start preparing for the foundation work. We are looking forward to trying out a new system for the foundation, using a three in one product that serves as foundation footing material, foundation drainage and radon collection.

Loveland Pano

Here’s a view looking out from the back of the property, it really is a beautiful site!

Pretty soon we will be starting the site work on another project in Berthoud and we are also looking forward to a cutting edge project this spring (the client really wants to push the envelope on building performance) that will be in Fort Collins. As always we are grateful for the folks that are interested in what we are doing and want us to be a part of building their home!

Need Convincing??

2015-10-22 11.40.48

It’s been cold lately, on Thursday the temperature hung around the 20’s, Friday it didn’t get over 20, and today is looking much the same. Cold. Cold. Cold. That also means that the heaters all across the Front Range are running, but not everywhere!!! Oh no friends, up in Nederland, CO (where the temperature is usually 20 degree (F) colder), in the house we finished this spring, the heat is NOT on!!! Say What?!?! You read that right, the homeowners just in the last 30 min sent a text telling us that they have yet to turn their heater on, despite it being so dang cold out. Jealous? I know I would be!!