Fort Collins Project: Concrete Floor

Once the walls were poured, we got right to work getting the floor ready to be poured.

Steps that had to be taken before concrete could be laid were: trench for in-slab plumbing, trench for drainage and radon mitigation, backfill, compact, install steel posts and beams, move in and level gravel, lay out foam, lay out plastic, install rebar mesh, install heat loops, and add chairs for mesh.

IMG_20180223_103658282_HDR

IMG_20180224_134432384_HDRIMG_20180302_155553669_HDRIMG_20180306_114951843IMG_20180308_170849246_HDRIMG_20180314_103750790_HDRIMG_20180314_170429754_HDRIMG_20180319_112056915IMG_20180320_141400672_HDRIMG_20180322_164607719IMG_20180326_192047856IMG_20180327_070443776_HDRIMG_20180327_123338207IMG_20180327_123343384IMG_20180327_123457470

Have any thoughts or questions? Let us know in the comments!

Stability

On our Fort Collins project, the homes entryway landing is built up from the ground level. To add stability to the backfilled dirt, we have spent a great deal of time getting chummy with the compactor and we have also added concrete to the loose dirt. Check it out below!

IMG_20180123_123319035_HDR

Here is the space before being backfilled. The entire front section of the home is being built up.

IMG_20180312_174213556_HDRIMG_20180312_174235976IMG_20180312_110433742

IMG_20180314_153448750_HDR

Once backfilled and compacted, Eric began forming up the stairs and landing.


IMG_20180327_123435113IMG_20180327_112608913_HDRIMG_20180327_123457470

There’s more concrete to be poured at the front, but at the moment we have the stairs competed and a small portion of the upper landing.

 

Unveiling

One of the most prominent features of our current project in Fort Collins, is the first level concrete walls. These walls are 11ft tall and except for the front entrance planter (seen in this video) are smooth faced; the planter is board formed. The walls were formed with snap ties and have a very modern look. As we continue to strip away the forms on the walls we will share more videos and photos of this feature!

We also plan to host periodic open houses throughout this project, giving anyone interested an opportunity to come meet us, check out our project and ask questions. We will post the days of these events here and on our Instagram account.

That Brindle Look

Have you missed us? We’ve been busy but have some exciting update posts on the way to show just how things are progressing!

IMG_4398e

We’ve poured the concrete floor, and remaining walls on our Loveland site. We had some really strong winds Tuesday while we poured the walls, making for a lot of fun with the pump truck and hose. The following day was much calmer and hotter, and we started bright and early. The pour went smoothly, thanks in part to great team work from everyone and having a good pump operator…and a tiny person to keep everyone  in check!

IMG_4448e

Hammer-Wielding Tiny Girl Boss

The slab is going to be stained, and to give it a nice look, we’ve burnished it. The slab is also fitted for radiant floor heating.

IMG_4386IMG_4393IMG_4398eIMG_4404IMG_4406IMG_4412

Quinn (above) stripping forms where the outdoor fireplace will be. The concrete was poured in several locations with the board formed look, giving it a rustic and also modern feel. 

IMG_4418IMG_4420IMG_4426IMG_4424IMG_4440IMG_4452IMG_4456

Later in the afternoon, we began stripping the foundation forms and Jason started making saw cuts the following day.

IMG_4475IMG_4480

In the next post, we will be showing off how the framing is going. We’ve had a few stall days due to rain (and snow) but it’s moving along and we can’t wait to post about it!