Windows pt. 2

“Baby It’s Cold Outside” has been the jingle on our minds at our Fort Collins project these last few weeks. Between adjusting to winter temperatures and crazy winds that blow down from the mountains, our work space has been just a little chilly and most days we look like we may have added 10lbs to our person just in winter layers!

Last week we installed the large glass window/doors that over look the patio deck. This large glass fixture is on the South Side of the house, so during those chilly winter days the homeowners will benefit from the heat gains at this location!

Check out our super fun process photos and a few other window shots!

IMG_20181205_091217579_BURST000_COVER_TOPIMG_20181205_091247876IMG_20181205_131322437IMG_20181205_141359097IMG_20181205_141445487

~

~

IMG_20181120_090649262IMG_20181120_090612676

Trusses

This week we put down the bottom sill plate for our first floor and today we began marking out truss locations, and bringing  trusses into the house to set in place. It is exciting to be starting the framing, as lots of people stop by to ask us what we are doing.

IMG_20180405_144809_202

IMG_20180405_085823280IMG_20180405_095620752

IMG_20180405_085728047

download_20180405_144449

 

Fort Collins Project: Concrete Floor

Once the walls were poured, we got right to work getting the floor ready to be poured.

Steps that had to be taken before concrete could be laid were: trench for in-slab plumbing, trench for drainage and radon mitigation, backfill, compact, install steel posts and beams, move in and level gravel, lay out foam, lay out plastic, install rebar mesh, install heat loops, and add chairs for mesh.

IMG_20180223_103658282_HDR

IMG_20180224_134432384_HDRIMG_20180302_155553669_HDRIMG_20180306_114951843IMG_20180308_170849246_HDRIMG_20180314_103750790_HDRIMG_20180314_170429754_HDRIMG_20180319_112056915IMG_20180320_141400672_HDRIMG_20180322_164607719IMG_20180326_192047856IMG_20180327_070443776_HDRIMG_20180327_123338207IMG_20180327_123343384IMG_20180327_123457470

Have any thoughts or questions? Let us know in the comments!

Looking Around: Berthoud Project

Things are rolling on our Berthoud Project. The cellulose has been blown in and drywall is just about finished. Here is a little peek around the house.

IMG_20170814_143950_941

Standing in the Dinning Room, kitchen to the right.

IMG_20170814_144039_684

Looking out from the Master bedroom toward the Office (where tiny boss is), Living and Dinning rooms. Also looking up to the second level.  

IMG_20170814_144131_256

In the Master bedroom, to the left is the closet and to the right is the bathroom.

IMG_20170814_144237_073

Moving upstairs, we can see a bedroom, bathroom and the beginning of the loft space.

IMG_20170814_144306_714

Here we see the rest of the loft space, a second bedroom is behind the loft wall and then to the right is the mechanical room.

20170814_144324

Looking down out from the loft area toward the entry way where the office is visible.

20170814_144541

Moving back downstairs, this is the kitchen area. To the right is the pantry. Down the hallway is a laundry room, powder and entry into the garage.

20170814_144609

Last we have a panorama from the dinning room looking into the kitchen (to the left) and the living room and entry way. to the far left in the photo you can see the master bedroom door, and in the right corner is the office space. 

Summers End

group-photo

Summer is quickly coming to an end. We are happy about the cooler weather, and how well our project in Loveland is progressing. We are looking forward to new projects moving along in their stages of planning and we look forward to hearing from you-when you’re ready to build your dream home.

Energy With A View

When we think of solar installations, we generally think of those big black panels that dot the roofs of homes, buildings and sometimes the roadside. But what about windows?

When Robert Clarke from Alpen HPP LLC (our window supplier), called us up and asked if we would be interested in meeting the VP Sales Rep from Solaria about a new BIPV  (Building-Integrative Photovoltaic) technology they were working on for residential homes, we said yes! Solaria has been talking with Alpen to produce highly efficient windows with a solar grid in them. Not only would you/potential customers be getting a high performance window, but also one that is going to generate energy for your home. The windows have already been installed in larger commercial buildings, one specifically in Japan, you can find the link to the article below. Currently their BIPV glass panels, used in conjunction with standard glass windows are taking the idea of being “green” and “sustainable” to a new level. The panels not only collect solar energy, they provide glare control, thermal performance and effective daylighting (Solaria).

The idea of combining solar windows on a home, while also getting the benefit of daylighting, thermal control and glare reduction desired in a window is exciting. The fact that these cells are unobtrusive to the view is a huge positive. We are looking forward to seeing  how Solaria and Alpen continue to work out the details of making these panels for residential installations.

Here’s Jason, holding up the sample pane Scott Hoover brought over (the image has been edited to show the outline of the cells better. Had this image not been manipulated, you the reader would have thought Jason was just standing there with his arm up for fun-not something he is particularly known for)

20160901_162619

 

Link to Solaria’s BIPV System in Japan: ASAHI GLASS COMPANY AND SOLARIA ANNOUNCE STRATEGIC PARTNERSHIP TO DELIVER ADVANCED BIPV SOLUTIONS TO THE ASIAN MARKET

Link to Alpen Windows: http://thinkalpen.com/

 

Summer Hustle

IMG_4588.

IMG_4693eThese three have been staying busy; unlike the tiny boss chilling in the wheelbarrow above.

Once framing and sheathing wrapped up, we quickly got to work on air/water/vapor sealing, and installing windows, doors, trim and siding.

IMG_20160617_182028

IMG_20160616_095247

IMG_4677e

The design of the homes exterior incorporates wood, stone and brick. The homeowner had two colors of wood that she stained, one very dark and one very light-you could say it’s black and and white in appearance, but up close there is a lot more color variations including tones of brown and green that help give the homes exterior a very rustic country look.

IMG_4691e

Here is a corner photo of the two stains side by side.

IMG_4670eIMG_4674e

As you can see, there is a lot of character and variation in the color of the siding depending on light and where a person is standing.

IMG_4700e

The white siding has also been used as an accent color under some windows. The Cupolas along the roofs ridge provide a bit more character along the gable.

IMG_20160616_094641

The rough plumbing and electrical have been completed and we are getting ready to start blowing insulation.

IMG_4667

Just look at that light switch box! We really appreciate the work both the plumbing and electrical contractors have done!IMG_4695e

Here is a photo of the tenting around the fire sprinklers. This is a mandatory step before insulation can be installed. What we are doing, is creating a barrier between the sprinkler line and the cellulose; which will help to prevent/minimize the chance of the line freezing. The netting seen above the line will also be tacked to the studs along the walls, and cellulose will be blown in and dense packed.

Loveland Project Framing Tour: Exterior

IMG_4580.JPG

Today we are trying out something new, a video tour of our current project. This video in particular is of the exterior framing. The goal is is give our readers an idea of how the home is shaping up and to also start getting videos out there. It’s all a work in progress! Next week we hope to have a second video of the interior spaces posted.

*This video takes a moment to start playing from the time you press play.

Sprouting Up

Aaahh, spring has arrived in Colorado…or at least it seems that way on a bi-weekly basis. One week sunny and hot, the next cold and wet.

As promised, in the previous post a look into how the framing has been going. We have brought on, J & D Builders from Greeley to help us out, and we are really enjoying working with them.

IMG_4559e

Profile view. The Kitchen area has trusses on. The garage is being sheathed for the second floor.

IMG_4488

Tilting up walls. These guys have had no problem working with our double wall framing system.

IMG_4542

Looking out the Dinning room window, that tiny person was placed there for scale. The homeowners wanted big windows to really capture the view they have of the buttes and Horsetooth Rock from the North side of their home.

IMG_4545

Jason and Bryan standing in the Kitchen.

IMG_4550

Looking out from the Kitchen into the rest of the first level. The “tiny person for scale” is standing in the Master Bedroom. The beam is situated over the Living Room.

IMG_4552

Here our scale model is standing under the beam and in front of her is the wash room and access to the garage. There are high ceilings throughout. The beams and columns for this project are Beetle Kill Pine, milled from The Forks Lumber Mill, whom we used for the Nederland Home.

IMG_4539

Here’s a look into the wall cavity. Soon we will be dense packing a whole semi load of cellulose into these cavities. One the ground is our vapor barrier. Just as on a roof, we must maintain a dry environment for the durability of our materials and the house as a whole.

IMG_4556

Scale Model standing in the Garage. Above the garage will be bedrooms.

IMG_4533

Here’s a look at some amazing custom made brackets we had done for the home from Charles Lefkowitz at, Sculpture and Functional Metal Work. We will have an upcoming post with more photos of the brackets we are using.

IMG_4501

IMG_4536

There last two photos are of the column brackets, one from the side, and one from the front. These brackets are giving structural stability and a very modern and industrial look to the home.