Stairs!

The stair way from the second to third floor went in a few weeks back. This section of stairway is a floating stairway. The treads will be an oak wrap. The stringer will remain visible and there will also be a custom steel handrail. All the metal work on this project is being done by Curly Metal Fabrication!

Two Flights of StairsAbove: Stair way from entry way to the “basement” level. 

StairWay

Above: Floating Stairway from Second Level to Third level

Stairway 2

We can’t say enough about working with great people, and Ben Curly and his team are great to work with! Below is Andrew welding things together, which I personally was thrilled about because it meant no more hauling materials up and down a ladder!! Woohoo!!

Andrew Welding 1Andrew Welding 2

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s